Roof replacement timeline, at a glance

On a typical St. Louis house, our crew tears off the old roof and installs the new one in a single working day. Larger, steeper or more complicated roofs can take two or three days, and weather or an insurance claim can add time before the crew ever arrives. Call (314) 429-6000 with questions about your schedule.

Before install day

Most of the calendar time happens before anyone climbs a ladder.

The first step is a free inspection, which we can usually schedule within a few days of your call. You get photos and a written estimate. If the roof is being replaced because of storm damage, the insurance claim adds its own steps: filing, the adjuster's visit, and the insurer's decision. That can take anywhere from a week to several weeks depending on the company and how busy they are after a storm.

Once you sign, we order materials and apply for the permit. Most municipalities in St. Louis County and the City of St. Louis require a permit for a roof replacement. Some approve quickly, others take longer. We handle the application and schedule your install once the permit and materials are in hand.

New asphalt shingles being installed during a one-day roof replacement in St. Louis

What happens on install day

  1. Morning setup

    Materials delivered, tarps laid over landscaping, a dumpster or trailer positioned near the house.

  2. Tear-off

    Old shingles and underlayment removed down to the deck, one section at a time.

  3. Deck repair and underlayment

    Soft or damaged sheathing replaced, then ice and water and synthetic underlayment installed.

  4. Shingles, flashing and ridge

    New shingles, flashing, vents and ridge cap go on, followed by cleanup and a magnetic sweep for nails.

What can stretch the schedule

These are the usual reasons a job takes longer than planned.

Weather

We do not tear off a roof with rain in the forecast. Spring storms and summer heat can shift dates.

Rotten decking

Extensive sheathing replacement adds hours or sometimes a second day.

Steep or complex roofs

Steep pitches, many valleys and dormers slow the work for safety and accuracy.

Multiple layers

Houses with two or three old layers take longer to strip.

Insurance claims

Adjuster scheduling and approvals happen before we can order material.

Permit processing

Some municipalities approve the same week, others take longer.

Typical timeline at a glance

Free inspectionUsually within a few days of your call
Written estimateSame visit or shortly after
Insurance claim (if any)About one to several weeks, depending on the insurer
Permit and materialsVaries by municipality and season
Install, typical homeOne working day
Install, large or complex homeTwo to three working days
Final walk-throughAt the end of the install

Planning around your roof

You do not have to leave the house during the install, but expect noise and some vibration inside. Take pictures off walls on the top floor, move cars out of the driveway, and keep pets inside or away. Your attic will catch some dust, so cover anything stored up there.

John Beal Roofing is a third-generation family company that has been replacing St. Louis roofs since 1947. We are an Owens Corning Platinum Preferred Contractor, BBB A+ rated and on Roofing Contractor Magazine's Top 100 list. Our phones are answered 24 hours a day and every roof we install comes with a lifetime workmanship warranty. Learn more about roof replacement cost in St. Louis.

  • Move vehicles out of the driveway the night before
  • Take fragile items off upstairs walls and shelves
  • Cover belongings stored in the attic
  • Keep pets indoors or away during tear-off
Roof replacement in progress showing tear-off and new underlayment on a St. Louis home

Roof replacement timeline questions

Can a roof really be replaced in one day?
Yes, on most St. Louis houses. The crew tears off and installs the new roof in a single working day.
What if it rains during my roof replacement?
We watch the forecast and do not start tear-off when rain is expected. If weather moves in, the crew covers any open areas before leaving.
Do I need to be home on install day?
Not necessarily. We do like to walk the finished roof with you, which can happen at the end of the day or later.
How far out are you scheduling?
That depends on the season. Call and we will give you a current estimate of lead time.
Does the permit slow things down?
Sometimes. We apply for it right after you sign, so it is usually ready by the time materials arrive.

Get your roof replacement timeline

Fill this out and we'll call you back. If water is coming in right now, phone us instead so we can move faster.

No obligation and no pressure. We will call to confirm a time that works, and inspections are free. Need someone right now? Call (314) 429-6000 — a real person answers 24 hours a day.

Ready To Get On The Schedule?

Start with a free inspection and we will give you a realistic timeline for your house.

Call Now Free Inspection